Final | 10/16/2003 | 10/17/2003 | 10/17/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/16/2003 at 11:44:35 AM. Contact: ###-####.
|
PLM-Aging Inspection | 10/13/2003 | 10/13/2003 | 10/13/2003 | | PASS |
Jim Johnson
|
|
|
still working on porject 10/13/2003 8:05:50 AM
|
Med/Gas Systems | 8/11/2003 | 8/12/2003 | 8/12/2003 | P | PASS |
Jim Johnson
|
|
|
end of 24 hour pressure test ok 8/12/2003 4:48:56 PM
|
Plumbing Rough-in | 8/11/2003 | 8/11/2003 | 8/11/2003 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 8:10:31 AM. Contact: ###-####. start of 24 hr pressure test on main line ,s med gas in hall way,s 8/11/2003 3:21:30 PM
|
Plumbing Rough-in | 7/14/2003 | 7/15/2003 | 7/15/2003 | A | PASS |
Jim Johnson
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows all under floor drain piping completed 7/15/2003 11:50:22 AM
|
Plumbing Rough-in | 7/10/2003 | 7/14/2003 | 7/14/2003 | A | PASS |
Jim Johnson
|
|
|
under floor drains and in wall rough-in for room,s 570 and 558 test ok 7/14/2003 10:03:47 AM
|
Plumbing Rough-in | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/10/2003 at 8:15:03 AM. Contact: ###-####. need to retest under floor drains for room,s 570 and 558 7/10/2003 2:38:44 PM
|
Plumbing Rough-in | 7/2/2003 | 7/2/2003 | 7/2/2003 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/2/2003 at 10:45:43 AM. Contact: ###-####. re-circ. line on south side test ok under floor drains in room,s 568 and 559a test ok 7/2/2003 5:28:13 PM
|
Plumbing Rough-in | 6/30/2003 | 6/30/2003 | 6/30/2003 | P | PART |
Jim Johnson
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Annette Moore under floor drain,s for room 515 &564.1 and 564.2 test ok 6/30/2003 5:07:27 PM
|
Med/Gas Systems | 6/26/2003 | 6/27/2003 | 6/27/2003 | A | PASS |
Jim Johnson
|
|
|
24 hour pressure test for zone valve location,s test ok 6/27/2003 10:18:46 AM
|
Plumbing Rough-in | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | PART |
Jim Johnson
|
|
|
###-#### josh start of 24 hour pressure test on med gas zone valves 6/26/2003 11:06:40 AM
|
Plumbing Rough-in | 6/23/2003 | 6/24/2003 | 6/24/2003 | A | PART |
Jim Johnson
|
|
|
###-#### josh pressure test on med gas for room,s 522 & 524 test ok in wall rough-in for room,s 522 through 525 ok 6/24/2003 11:20:44 AM
|
Plumbing Rough-in | 6/19/2003 | 6/20/2003 | 6/20/2003 | A | PART |
Jim Johnson
|
|
|
###-#### josh start of pressure test for med gas in room,s 522 and 524 under floor drains for room 524 and 525 test ok under floor drain for restroom group in room,s 573&574 test ok 6/20/2003 11:02:28 AM
|
Med/Gas Systems | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PART |
Jim Johnson
|
|
|
24 hour pressure test for room,s 521, 523 and 525 test ok will need to retest room 524 6/18/2003 11:02:26 AM
|
Plumbing Rough-in | 6/16/2003 | 6/17/2003 | 6/17/2003 | A | PART |
Jim Johnson
|
|
|
###-#### Josh start of 24 hr pressure test on med gas for room,s 521,522, 523 and 525 6/17/2003 11:08:57 AM
|
Med/Gas Systems | 6/11/2003 | 6/12/2003 | 6/12/2003 | P | PART |
Jim Johnson
|
|
|
24hr pressure test for room,s 519&520 and tub room test ok 6/12/2003 4:58:42 PM
|
Plumbing Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 | P | PART |
Jim Johnson
|
|
|
###-#### JOSH start of 24 hr pressure test on med gas for room,s 519 & 520 and tub room on south side 6/11/2003 3:18:13 PM
|
Med/Gas Systems | 6/9/2003 | 6/10/2003 | 6/10/2003 | P | PART |
Jim Johnson
|
|
|
24 hr. pressure test for room,s 516 and 518 test ok 6/10/2003 5:27:52 PM
|
Plumbing Rough-in | 6/9/2003 | 6/9/2003 | 6/9/2003 | P | PART |
Jim Johnson
|
|
|
JOSH; Phone #: ###-#### Internet Inspection Request from: Darla Downs start of 24 hr. pressure test of med gas for room,s 516 and 518 under floor drain,s for laves in room 517 and 518 test ok in wall rough-in for room,s 517 through 519 test ok 6/9/2003 4:16:35 PM
|
Med/Gas Systems | 6/5/2003 | 6/6/2003 | 6/6/2003 | A | PART |
Jim Johnson
|
|
|
med gas 24 hr pressure test for rooms 512 513 &517 test ok will need to retest med gas for room 516 pressure test failed in wall rough-in for room,s 516 test ok 6/6/2003 9:55:17 AM
|
Plumbing Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 | A | PART |
Jim Johnson
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore under floor drain,s in room,s 518&519 test ok start of med gas pressure test on room,s 512 through 517 6/5/2003 9:56:23 AM
|
Plumbing Rough-in | 6/2/2003 | 6/3/2003 | 6/3/2003 | A | PART |
Jim Johnson
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Annette Mooreunder floor drain,s for room 517 ok in wall rough-in for room,s511 through 513 test ok ok to cover 6/3/2003 10:48:04 AM
|
Med/Gas Systems | 5/28/2003 | 5/29/2003 | 5/29/2003 | A | PART |
Jim Johnson
|
|
|
24-hour pressure test for room,s 507 through511 test ok under floor drain,s for room,s 515 and 516 test ok 5/29/2003 12:41:52 PM
|
Plumbing Rough-in | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/27/2003 at 11:47:23 AM. Contact: ###-####. rough-in retest on room,s 510&511 test ok start of med gas pressure test on rooom,s 507 tthrough 511 5/28/2003 12:21:16 PM
|
Plumbing Rough-in | 5/22/2003 | 5/23/2003 | 5/23/2003 | P | PART |
Jim Johnson
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Annette Moore in wall rough-in for lav,s 508 through 511 test ok need to retest drain in restroom,s 511&510 5/23/2003 3:28:30 PM
|
Med/Gas Systems | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | PART |
Jim Johnson
|
|
|
pressure test on med gas 24 hour test ok in wall rough-in on room, s 510&511 ok under floor piping for drain,s forromm 513 ok 5/21/2003 11:53:00 AM
|
Plumbing Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 | A | PART |
Jim Johnson
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore start of 24 hour pressure test on med gas for room,s 503 through 506 also in wall rough-in on lav in room 507 test ok 5/20/2003 11:05:08 AM
|
Plumbing Rough-in | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | PASS |
Jim Johnson
|
|
|
repiping for shower drain in room 512 under floor ok ok to cover 5/19/2003 3:07:15 PM
|
Plumbing Rough-in | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 8:02:55 AM. Contact: ###-####.in wall piping for lav rough-in in rooms 503 through 506 test ok need to repipe under floor drain to shower in room 512 5/16/2003 3:55:36 PM
|
Plumbing Rough-in | 5/12/2003 | 5/13/2003 | 5/13/2003 | A | PART |
Jim Johnson
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore under floor drains for room510&511 test ok rough-in for room,s 503 through 506 test ok 5/13/2003 12:34:07 PM
|
Plumbing Rough-in | 5/12/2003 | 5/12/2003 | 5/12/2003 | P | PART |
Jim Johnson
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Annette Moore repipe and support vent piping in wall between room 505 and 506 so piping and connection,s are not under strain or stress and retest system contractor to recall when ready 5/12/2003 4:21:51 PM
|
Plumbing Rough-in | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | PART |
Jim Johnson
|
|
|
JOSH; Phone #: ###-#### Internet Inspection Request from: Darla Downs under floor drain,s for lav,s in room 510&511 test ok 5/8/2003 10:16:15 AM
|
Plumbing Rough-in | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/5/2003 at 4:54:22 PM. Contact: ###-####. 5/6/2003 10:14:05 AM under floor drain,s for room,s 507- 508 test ok ok to cover 5/6/2003 12:01:42 PM
|
Plumbing Rough-in | 5/1/2003 | 5/2/2003 | 5/2/2003 | A | PART |
Jim Johnson
|
|
|
JOSH; Phone #: ###-#### Internet Inspection Request from: Darla Downs under floor drains for room,s 505-506 test ok ok to cover 5/2/2003 10:03:19 AM
|