Final | 8/18/2003 | 8/18/2003 | 8/18/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/18/2003 at 9:02:33 AM. Contact: ###-####.
|
Plumbing Rough-in | 5/11/2003 | 5/12/2003 | 5/12/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/11/2003 at 6:52:00 PM. Contact: ###-####.
|
Plumbing Rough-in | 5/6/2003 | 5/7/2003 | 5/7/2003 | P | PART |
Jim Johnson
|
|
|
shane ###-####; Phone #: ###-#### Internet Inspection Request from: Annette Moore need to test D.W.V need to support abs drain,s and vent,s every 4 feet anchor pex water piping every 32 inches anchor tub and shower valve home owner to recall when ready 5/7/2003 1:57:28 PM
|