Final | 6/11/2003 | 6/12/2003 | 6/12/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 3:38:02 PM. Contact: ###-####. final only for water heater shower and toilet contractor will repermit when ready to install wash basin,s 6/12/2003 3:37:45 PM
|
Plumbing Rough-in | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 9:46:39 AM. Contact: ###-####.
|