Final | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | PASS |
Gary Ziegler
|
|
|
|
Plumbing Rough-in | 6/9/2003 | 6/9/2003 | 6/9/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 7:48:47 AM. Contact: ###-####.
|
Groundwork | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 8:31:24 PM. Contact: ###-####.
|