Final | 9/15/2003 | 9/16/2003 | 9/16/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 12:25:14 PM. Contact: ###-####.
|
Final | 9/12/2003 | 9/12/2003 | 9/12/2003 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 8:20:41 AM. Contact: ###-####. need to have premise protection tested and ceritified caulk all mop sink,s to wall and floor lower floor cleanout,s flush with floor ( two locations ) left correction notice with general on job site 9/12/2003 2:37:52 PM
|
Plumbing Rough-in | 7/23/2003 | 7/24/2003 | 7/24/2003 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/23/2003 at 10:55:13 AM. Contact: ###-####. not ready 7/24/2003 10:40:30 AM
|
Plumbing Rough-in | 7/24/2003 | 7/24/2003 | 7/24/2003 | P | PASS |
Jim Johnson
|
|
|
|
Groundwork | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/10/2003 at 12:42:14 PM. Contact: ###-####.
|