Final | 9/3/2003 | 9/4/2003 | 9/4/2003 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 3:46:14 PM. Contact: ###-####. final ok 9/4/2003 9:42:52 AM
|
Final | 7/31/2003 | 7/31/2003 | 7/31/2003 | P | FAIL |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 7/31/2003 at 9:39:01 AM. Contact: ###-####. no access 7/31/2003 2:59:12 PM
|
Plumbing Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 11:05:45 AM. Contact: ###-####. ri ok 6/11/2003 4:20:29 PM
|