Final | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 9:22:42 AM. Contact: ###-####.
|
Plumbing Rough-in | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/17/2003 at 4:58:06 PM. Contact: ###-####.
|
Plumbing Rough-in | 6/17/2003 | 6/17/2003 | 6/17/2003 | P | FAIL |
Jim Johnson
|
|
|
###-#### nels water test failed on north down unit need to provide riser clamp,s on all cast iron drop,s need to provide sleeve for water piping through foundation wall in crawl need to fix leak on trap primer on trap to northside washer pan need to support abs drain,s in crawl every 4 feet called contractor will recall when ready 6/17/2003 5:10:35 PM 6/17/2003 5:11:25 PM
|