Final | 8/29/2003 | 8/29/2003 | 8/29/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 8:37:50 AM. Contact: ###-####.
|
Plumbing Rough-in | 8/13/2003 | 8/14/2003 | 8/14/2003 | A | PASS |
Bill VanDegrift
|
|
|
engineer ok with water sizing 8/14/2003 8:51:02 AM
|
Plumbing Rough-in | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser water sizing is way off of what the engineer desighned, called him and told him what it looked like, he was going to make a decission and call me, musgrove. 8/13/2003 3:13:51 PM
|
Plumbing Rough-in | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | CANC |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser Inspection cancelled from web by: Liz Sasser
|