Plumbing Rough-in | 8/15/2003 | 8/19/2003 | 8/19/2003 | A | DONE |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/15/2003 at 9:05:36 AM. Contact: ###-####. rough-in inspection was done on 7/25/03 8/18/2003 12:00:38 PM
|
Final | 8/18/2003 | 8/18/2003 | 8/18/2003 | A | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 7/25/2003 | 7/25/2003 | 7/25/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 9:01:28 AM. Contact: ###-####.
|
Plumbing Rough-in | 7/21/2003 | 7/21/2003 | 7/21/2003 | P | NR |
Jim Johnson
|
|
|
MARIE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows not ready -- not even rough-in yet 7/21/2003 1:18:07 PM
|