Final | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 11/18/2003 at 9:28:55 AM. Contact: ###-####.
|
Roof Drains | 10/27/2003 | 10/28/2003 | 10/28/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/27/2003 at 4:31:19 PM. Contact: ###-####.
|
Roof Drains | 10/24/2003 | 10/27/2003 | 10/27/2003 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/24/2003 at 11:33:34 AM. Contact: ###-####. not ready contractor to recall when ready 10/27/2003 10:06:54 AM
|
Plumbing Rough-in | 10/1/2003 | 10/2/2003 | 10/2/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 5:08:35 PM. Contact: ###-####.
|
Plumbing Rough-in | 9/26/2003 | 9/26/2003 | 9/26/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/26/2003 at 10:57:04 AM. Contact: ###-####.
|
Water and/or Sewer | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/2/2003 at 11:35:23 AM. Contact: ###-####. s.s. manhole must have approval from the civil engineer for deveation from the approved plans. ok to cover gravity sewer from the building to the street except at the manhole. 9/3/2003 9:13:40 AM
|
Water and/or Sewer | 8/29/2003 | 8/29/2003 | 8/29/2003 | A | PART |
Bill VanDegrift
|
|
|
ok to cover the road crossing, testing this aftrernoon on the pressure sewer from the shop and the gravity from the terminal building
|
Water and/or Sewer | 8/29/2003 | 8/29/2003 | 8/29/2003 | P | PART |
Bill VanDegrift
|
|
|
1:00 or so pump line ok to cover gravity out of the main building is backgraded 8/29/2003 1:47:23 PM
|
Water and/or Sewer | 8/29/2003 | 8/29/2003 | 8/29/2003 | A | PART |
Bill VanDegrift
|
|
|
ok to cover the road crossing, testing this aftrernoon on the pressure sewer from the shop and the gravity from the terminal building
|
Water and/or Sewer | 8/29/2003 | 8/29/2003 | 8/29/2003 | P | PART |
Bill VanDegrift
|
|
|
1:00 or so pump line ok to cover gravity line out of the main building is backgraded 8/29/2003 1:48:07 PM
|
Groundwork | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/27/2003 at 9:30:28 AM. Contact: ###-####.
|
Water and/or Sewer | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 2:13:06 PM. Contact: ###-####. two inch water line to northern builbing test ok ok to cover 8/26/2003 11:01:38 AM
|
Groundwork | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | PART |
Bill VanDegrift
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Marc Lileks everythiong except gw at D-D.9/14 8/21/2003 3:39:31 PM
|