Final | 10/9/2003 | 10/10/2003 | 10/10/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/9/2003 at 2:51:43 PM. Contact: ###-####.
|
Plumbing Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 8:52:38 AM. Contact: ###-####.
|
Plumbing Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 6:09:12 AM. Contact: ###-####. test failed on water system need to correct leak on main supply line and leak on tub and shower valve on over head tub on east side told plumber on job site contractor to recall when ready 8/7/2003 1:29:08 PM
|