Final | 8/28/2003 | 8/28/2003 | 8/28/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 8:37:16 AM. Contact: ###-####.
|
Final | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 8:19:09 AM. Contact: ###-####. no fixtures installed no inspection contractor to recall when ready 8/26/2003 10:13:47 AM
|
Plumbing Rough-in | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/31/2003 at 5:04:51 PM. Contact: ###-####.
|