Final | 12/14/2003 | 12/15/2003 | 12/15/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/14/2003 at 8:19:50 PM. Contact: ###-####.
|
Plumbing Rough-in | 9/29/2003 | 9/29/2003 | 9/29/2003 | P | PASS |
Jim Johnson
|
|
|
peter; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Plumbing Rough-in | 9/24/2003 | 9/25/2003 | 9/25/2003 | A | FAIL |
Jim Johnson
|
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Darla Downs need to pipe ejector discharge line to 4 inch drain need to pipe 1 inch water up through water heater to first bathroom for water distribution on hot side told plumber on job site wiil recall when ready 9/25/2003 9:14:53 AM
|
Groundwork | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | FAIL |
Bill VanDegrift
|
|
|
###-#### should be able to accessable by gravity, verify 8/7/2003 9:19:54 AM
|
Groundwork | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | PASS |
Jim Johnson
|
|
|
|