Final | 11/7/2003 | 11/7/2003 | 11/7/2003 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 11/7/2003 at 7:56:12 AM. Contact: ###-####.
|
Plumbing Rough-in | 9/15/2003 | 9/16/2003 | 9/16/2003 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 7:17:46 PM. Contact: ###-####.
|
Plumbing Rough-in | 9/15/2003 | 9/15/2003 | 9/15/2003 | P | NR |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 8:53:22 AM. Contact: ###-####.cxc 9/15/2003 9:42:54 AM four fixture units on 1 1/2 inch line 9/15/2003 3:09:14 PM
|
Plumbing Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | CANC |
Gary Ziegler
|
|
|
###-#### nell
|
Groundwork | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | PASS |
Gary Ziegler
|
|
|
|