Final | 3/4/2004 | 3/4/2004 | 3/4/2004 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 3/4/2004 at 8:34:24 AM. Contact: ###-####.
|
Plumbing Rough-in | 1/12/2004 | 1/13/2004 | 1/13/2004 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 3:36:21 PM. Contact: ###-####. ri ok 1/13/2004 3:18:30 PM
|
Plumbing Rough-in | 12/23/2003 | 12/24/2003 | 12/24/2003 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/23/2003 at 3:13:12 PM. Contact: ###-####. ri restrooms ok, kitchen wasterand vents, breakroom sink and class room sinks waste and vents tests ok and roof drains. 12/24/2003 11:08:13 AM
|
Plumbing Rough-in | 12/23/2003 | 12/23/2003 | 12/23/2003 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/23/2003 at 10:31:55 AM. Contact: ###-####. restrooms, kitchen ok to cover 12/23/2003 2:19:24 PM
|
PLM-Aging Inspection | 11/10/2003 | 11/10/2003 | 11/10/2003 | | PASS |
Bill VanDegrift
|
|
|
still working 11/10/2003 8:21:32 AM
|
Plumbing Rough-in | 9/8/2003 | 9/10/2003 | 9/10/2003 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/8/2003 at 9:33:37 AM. Contact: ###-####. this is the gw i did the other day 9/10/2003 1:38:53 PM
|
Groundwork | 9/8/2003 | 9/8/2003 | 9/8/2003 | P | PASS |
Bill VanDegrift
|
|
|
backwater valve, interceptor test ok
|
Plumbing Rough-in | 8/19/2003 | 8/19/2003 | 8/19/2003 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 9:31:41 AM. Contact: ###-####.
|
Plumbing Rough-in | 8/18/2003 | 8/18/2003 | 8/18/2003 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/18/2003 at 10:11:12 AM. Contact: ###-####. brian means needs his city card prior to inspection 8/18/2003 2:26:18 PM
|
Other | 8/12/2003 | 8/12/2003 | 8/12/2003 | A | PART |
Bill VanDegrift
|
|
|
conference, backwater valve, floor sinks under cabinrte, read plan attachments, temp water bfp, etc.
|