Final | 12/1/2003 | 12/2/2003 | 12/2/2003 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/1/2003 at 3:53:58 PM. 3- lavs and 2- wsc 2- tub/showers, 1-sink final ok 12/2/2003 9:38:29 AM
|
Plumbing Rough-in | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/25/2003 at 10:05:20 AM. Contact: ###-####.
|
Plumbing Rough-in | 9/18/2003 | 9/18/2003 | 9/18/2003 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/18/2003 at 6:09:07 AM. Contact: ###-####. 9/18/2003 9:24:31 AM needs tub and shower valves 9/18/2003 9:24:48 AM test ok 9/18/2003 9:24:56 AM
|