Final | 1/12/2004 | 1/12/2004 | 1/12/2004 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 8:11:15 AM. Contact: ###-####. final ok 1/12/2004 3:12:32 PM
|
Final | 1/5/2004 | 1/6/2004 | 1/6/2004 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 1/5/2004 at 11:33:31 AM. Contact: ###-####. open cabinets under soda mech. and coffee make extend toe kick around f.s. and seal, test all backflow preventors, install strainers and grates at all f.s., calk janitor sink, repair floor and calk wc, airgap prep sink waste. 1/6/2004 10:07:10 AM
|
Plumbing Rough-in | 11/10/2003 | 11/12/2003 | 11/12/2003 | A | PASS |
Bill VanDegrift
|
|
|
Mary; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ri ok 11/12/2003 9:04:20 AM
|
Plumbing Rough-in | 11/10/2003 | 11/10/2003 | 11/10/2003 | P | PASS |
Bill VanDegrift
|
|
|
a permenantly fastened ladder will be required to access waterheater 11/10/2003 2:14:11 PM
|
Groundwork | 10/14/2003 | 10/14/2003 | 10/14/2003 | A | PASS |
Bill VanDegrift
|
|
|
grewase trap is going to the s.s. not the grease line because there is no interceptor for the building
|
Plumbing Rough-in | 10/14/2003 | 10/14/2003 | 10/14/2003 | P | NR |
Bill VanDegrift
|
|
|
PERAS WATER SLAB INSPECT
|