Final | 3/4/2004 | 3/5/2004 | 3/5/2004 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/4/2004 at 2:26:53 PM. Contact: ###-####. final ok with rp drain over a 2" hub drain off washer box. 3/5/2004 9:15:38 AM
|
Final | 2/2/2004 | 2/3/2004 | 2/3/2004 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 2/2/2004 at 12:50:50 PM. Contact: ###-####. needs an rp on the spray on tan system 2/3/2004 9:54:26 AM
|
Final | 1/6/2004 | 1/6/2004 | 1/6/2004 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 9:48:10 AM. Contact: ###-####. set water supplied tanning equipment, trun t&p drain down. temp occ ok 1/6/2004 2:24:49 PM
|
Plumbing Rough-in | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PASS |
Lee Rice
|
|
|
Lacy Mechanical ###-####
|