Final | 3/10/2004 | 3/11/2004 | 3/11/2004 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 3/10/2004 at 10:58:39 AM. Contact: ###-####.
|
Plumbing Rough-in | 2/2/2004 | 2/2/2004 | 2/2/2004 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 2/2/2004 at 6:54:23 AM. Contact: ###-####. move water line from above trust bottom to below trusts. 2/2/2004 10:37:25 AM
|
Plumbing Rough-in | 1/29/2004 | 1/30/2004 | 1/30/2004 | A | FAIL |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 1/29/2004 at 11:04:35 PM. Contact: ###-####. branch drain into wet vent,, building double check not plumbed to protect bldg 1/30/2004 9:25:30 AM
|
Water and/or Sewer | 1/14/2004 | 1/15/2004 | 1/15/2004 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 1/14/2004 at 2:40:16 PM. Contact: ###-####.
|
Groundwork | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PASS |
Ron Ginner
|
|
|
moore ser plum--###-####
|