Final | 3/30/2004 | 3/31/2004 | 3/31/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/30/2004 at 7:08:11 PM. Contact: ###-####.
|
Plumbing Rough-in | 1/26/2004 | 1/27/2004 | 1/27/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 12:10:04 PM. Contact: ###-####.
|
Plumbing Rough-in | 1/22/2004 | 1/23/2004 | 1/23/2004 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 12:38:04 PM. Contact: ###-####. test failed on DWV need to support abs and pex piping as per table 3-2 upc 2000 need to nail plate softner riser,s 1/23/2004 10:47:13 AM
|