Final | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 2/17/2004 | 2/17/2004 | 2/17/2004 | P | PART |
Jim Johnson
|
|
|
###-#### jeremy need signage for non potable water system and finish installation of cover to ejector sump oked temp 2/17/2004 4:14:44 PM
|
Final | 2/10/2004 | 2/11/2004 | 2/11/2004 | P | PART |
Jim Johnson
|
|
|
jeremy-###-#### have main premise protection re certified need to provide seperate water supply with approved backflow device if needed for soap despencer provide signage for non potable water line in new addition area contractor to recall when ready 2/11/2004 3:35:00 PM
|
Plumbing Rough-in | 1/20/2004 | 1/21/2004 | 1/21/2004 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/20/2004 at 12:29:37 PM. Contact: ###-####. ground-work tested ok to cover 1/21/2004 8:48:02 AM
|
Plumbing Rough-in | 1/16/2004 | 1/20/2004 | 1/20/2004 | A | PART |
Jim Johnson
|
|
|
###-#### BUSS MECHANICAL in wall water only test ok ok to cover 1/20/2004 9:18:26 AM
|