Final | 5/5/2004 | 5/6/2004 | 5/6/2004 | A | PASS |
Jim Johnson
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Final | 4/30/2004 | 4/30/2004 | 4/30/2004 | P | PART |
Jim Johnson
|
|
|
oked temp need paper work for med gas system verification need to have backflow devices identified 4/30/2004 12:59:31 PM
|
Final | 4/27/2004 | 4/28/2004 | 4/28/2004 | A | PART |
Jim Johnson
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need rp for vac system need to run air intake to an approverd location need approved flexible connectorsor approved method to connect compressorto system 4/29/2004 1:46:31 PM
|
Plumbing Rough-in | 4/14/2004 | 4/16/2004 | 4/16/2004 | P | PART |
Jim Johnson
|
|
|
Rick -- late p.m. please. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes well disconnect ok had walk through with Bill T. with united water 4/16/2004 4:37:09 PM
|
Med/Gas Systems | 3/23/2004 | 3/24/2004 | 3/24/2004 | A | PASS |
Lee Rice
|
|
|
charlie; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Plumbing Rough-in | 3/22/2004 | 3/22/2004 | 3/22/2004 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/22/2004 at 7:52:57 AM. Contact: ###-####. hot and cold water under floor test ok need verification on pipe size on med air line 3/22/2004 4:24:20 PM
|
Plumbing Rough-in | 3/10/2004 | 3/11/2004 | 3/11/2004 | P | PART |
Jim Johnson
|
|
|
rick (partial rough in); Phone #: ###-#### Internet Inspection Request from: Annette Moore rough-in for sterilization room 105 test ok 3/11/2004 1:49:13 PM
|
Plumbing Rough-in | 3/8/2004 | 3/8/2004 | 3/8/2004 | A | PART |
Jim Johnson
|
|
|
24 hour pressure test for med air under slab in south east corner of building test ok 3/8/2004 9:48:14 AM
|
Plumbing Rough-in | 3/5/2004 | 3/5/2004 | 3/5/2004 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/5/2004 at 7:59:17 AM. Contact: ###-####. start of 24 hr pressure test med air system under slab only 3/5/2004 1:50:19 PM
|
Plumbing Rough-in | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | PART |
Jim Johnson
|
|
|
rick//late am please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rough-in on west side of building test ok 3/3/2004 2:04:53 PM
|
Plumbing Rough-in | 2/25/2004 | 2/25/2004 | 2/25/2004 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 2/25/2004 at 7:07:07 AM. Contact: ###-####. underground dwv only 2/25/2004 9:37:03 AM
|
Groundwork | 2/12/2004 | 2/13/2004 | 2/13/2004 | A | PART |
Jim Johnson
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes island sink,s for south west wing test ok ok to cover 2/13/2004 10:49:56 AM
|
Groundwork | 2/10/2004 | 2/10/2004 | 2/10/2004 | P | PART |
Jim Johnson
|
|
|
###-#### buss mech. new water line from meter to building test ok ok to cover 2/10/2004 3:44:13 PM
|