Final | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 4:24:34 PM. Contact: ###-####.
|
Final | 1/31/2005 | 1/31/2005 | 1/31/2005 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/31/2005 at 8:58:07 AM. Contact: ###-####. need PVB on hand held shower need elongated bowl with open frount seat in back rest room 1/31/2005 4:07:55 PM
|
Final | 1/27/2005 | 1/28/2005 | 1/28/2005 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 11:22:04 PM. Contact: ###-####. upc 409.1 water closet bowls for public use to be elongated type with open front seat (2) need to provide a PVB on hand held shower at hydroco table (3) have all backflow devices tested and certified (4) provide clearance and acess for testing and maintenance and repair for double check,s located in wall 1/28/2005 11:36:43 AM
|
Final | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 4:42:29 PM. Contact: ###-####.
|
PLM-Aging Inspection | 7/14/2004 | 7/14/2004 | 7/14/2004 | | PASS |
Jim Johnson
|
|
|
still working on project 7/14/2004 12:14:01 PM
|
Plumbing Rough-in | 5/13/2004 | 5/14/2004 | 5/14/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/13/2004 at 5:20:02 PM. Contact: ###-####.
|
Plumbing Rough-in | 5/13/2004 | 5/13/2004 | 5/13/2004 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/13/2004 at 6:37:51 AM. Contact: ###-####. test failed on DWV system water system test ok need to move pex water piping away from all can lighting 12 inches need to support all vent,s in over head every 4 feet 5/13/2004 10:37:50 AM
|
PLM-Aging Inspection | 5/10/2004 | 5/10/2004 | 5/10/2004 | | PASS |
Jim Johnson
|
|
|
still working on project 5/10/2004 9:54:25 AM
|
Plumbing Rough-in | 3/8/2004 | 3/8/2004 | 3/8/2004 | P | PASS |
Jim Johnson
|
|
|
ERIN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|