Final | 4/15/2004 | 4/15/2004 | 4/15/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/15/2004 at 8:24:25 AM. Contact: ###-####.
|
Plumbing Rough-in | 3/26/2004 | 3/26/2004 | 3/26/2004 | P | DONE |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/26/2004 at 7:56:23 AM. Contact: ###-####. DONE BY INSPECTOR 431 ON 3/25 /04 3/26/2004 2:20:45 PM
|
Plumbing Rough-in | 3/24/2004 | 3/25/2004 | 3/25/2004 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 3:47:56 PM. Contact: ###-####.
|