Final | 8/5/2004 | 8/5/2004 | 8/5/2004 | P | PASS |
Bill VanDegrift
|
|
|
final ok with fixtures calked 8/5/2004 1:38:55 PM
|
Plumbing Rough-in | 6/7/2004 | 6/7/2004 | 6/7/2004 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/7/2004 at 8:32:29 AM. Contact: ###-####. ri ok 6/7/2004 2:48:21 PM
|