Final | 9/15/2004 | 9/15/2004 | 9/15/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/15/2004 at 7:24:09 AM. Contact: ###-####.
|
Final | 9/9/2004 | 9/10/2004 | 9/10/2004 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/9/2004 at 10:54:38 PM. Contact: ###-####. not ready 9/10/2004 10:12:51 AM
|
Roof Drains | 7/28/2004 | 7/28/2004 | 7/28/2004 | P | PART |
Jim Johnson
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need to correct two leak,s on two over flow drains primary roof drains test ok called contractor will recall when ready 7/28/2004 4:10:35 PM
|
Plumbing Rough-in | 7/1/2004 | 7/2/2004 | 7/2/2004 | A | PART |
Jim Johnson
|
|
|
rougj-in for restroom,s and water heater room test ok ok to cover on east side of building 7/2/2004 8:29:53 AM
|
Plumbing Rough-in | 7/1/2004 | 7/1/2004 | 7/1/2004 | P | NR |
Jim Johnson
|
|
|
Kirk; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes not ready 7/1/2004 2:17:37 PM
|
Groundwork | 6/1/2004 | 6/2/2004 | 6/2/2004 | A | PASS |
Jim Johnson
|
|
|
|
Groundwork | 6/1/2004 | 6/1/2004 | 6/1/2004 | P | NR |
Jim Johnson
|
|
|
###-#### Kirk not ready 6/1/2004 1:18:57 PM
|