Final | 10/22/2004 | 10/22/2004 | 10/22/2004 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Final | 10/18/2004 | 10/19/2004 | 10/19/2004 | A | PART |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel need to have premius protection and sprinkler backflow tested and certerifed also need to move expansion tank,s to cold water side of heater,s and caulk water closet in west end of building contractor to recall when ready 10/19/2004 10:14:04 AM
|
Plumbing Rough-in | 8/30/2004 | 8/30/2004 | 8/30/2004 | P | PASS |
Ron Ginner
|
|
|
This is a partial rough-in and it is ready now please call Mitch @ ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | PASS |
Ron Ginner
|
|
|
Partial rough-in; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel center two bathrooms, dwv tested and water installed but needs test. okay to cover and test water with mains next week 8/25/2004 9:51:06 AM
|
Plumbing Rough-in | 8/24/2004 | 8/24/2004 | 8/24/2004 | P | CANC |
Jim Johnson
|
|
|
Partial Rough-in Thank You; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel Inspection cancelled from web by: Sonja Hankel
|
Groundwork | 8/6/2004 | 8/9/2004 | 8/9/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/6/2004 at 4:32:00 PM. Contact: ###-####.
|
Groundwork | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | PART |
Jim Johnson
|
|
|
This one is ready this morning, thank you; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel need to correct leak on 3 inch p-trap on west end of building middle and east end restroom group,s test ok ok to cover contractor to recall when west end is ready 8/6/2004 2:26:33 PM
|
Water and/or Sewer | 6/8/2004 | 6/9/2004 | 6/9/2004 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel sewer trunk line through building test ok ok to cover 6/9/2004 2:56:01 PM
|