Final | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | PASS |
Jim Johnson
|
|
|
|
Roof Drains | 11/3/2004 | 11/4/2004 | 11/4/2004 | A | PART |
Jim Johnson
|
|
|
ready at 9:00 AM need to pipe roof and overflow drains to pipe size on approved plan,s or provide letter from engineer ok , ing pipe size on installed roof and overflow drain,s 11/4/2004 3:10:24 PM
|
Roof Drains | 11/3/2004 | 11/3/2004 | 11/3/2004 | P | NR |
Jim Johnson
|
|
|
not ready 11/3/2004 4:28:39 PM
|
Groundwork | 6/24/2004 | 6/24/2004 | 6/24/2004 | A | PASS |
Gerry Varner
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|