Final | 9/22/2004 | 9/22/2004 | 9/22/2004 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/22/2004 at 7:51:03 AM. Contact: ###-####. final ok 9/22/2004 1:31:24 PM
|
Plumbing Rough-in | 8/17/2004 | 8/18/2004 | 8/18/2004 | P | PASS |
Bill VanDegrift
|
|
|
ri ok 8/18/2004 3:29:24 PM
|
Plumbing Rough-in | 8/17/2004 | 8/17/2004 | 8/17/2004 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/17/2004 at 8:01:32 AM. Contact: ###-####. needs a drop eat fitting at hose bib/ pex connection. 8/17/2004 2:28:34 PM
|
Plumbing Rough-in | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | PART |
Bill VanDegrift
|
|
|
###-#### - Pera's Plum - underground RI gw ok 7/30/2004 10:44:34 AM
|