Other | 12/15/2004 | 12/15/2004 | 12/15/2004 | A | CANC |
Bill VanDegrift
|
|
|
stopped by to verify the clearance on the future wc ri, and it was per code
|
Final | 12/13/2004 | 12/13/2004 | 12/13/2004 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/13/2004 at 8:20:37 AM. Contact: ###-####. final ok 12/13/2004 1:17:04 PM
|
Plumbing Rough-in | 10/21/2004 | 10/21/2004 | 10/21/2004 | P | PASS |
Bill VanDegrift
|
|
|
ri ok 10/21/2004 1:16:30 PM
|
Plumbing Rough-in | 10/20/2004 | 10/20/2004 | 10/20/2004 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/20/2004 at 8:52:55 AM. Contact: ###-####. use 2003 upc to size water system, pex too close to recessed light fixture, install water softenor drain, seal water service foundation penatration 10/20/2004 2:18:32 PM
|
Groundwork | 8/13/2004 | 8/16/2004 | 8/16/2004 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/13/2004 at 4:42:08 PM. Contact: ###-####. did this one friday pm 8/16/2004 9:08:02 AM
|
Groundwork | 8/13/2004 | 8/16/2004 | 8/16/2004 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/13/2004 at 4:42:08 PM. Contact: ###-####. did this one friday pm 8/16/2004 9:08:02 AM
|
Groundwork | 8/13/2004 | 8/16/2004 | 8/16/2004 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/13/2004 at 4:42:08 PM. Contact: ###-####. did this one friday pm 8/16/2004 9:08:02 AM
|
Groundwork | 8/13/2004 | 8/13/2004 | 8/13/2004 | P | PASS |
Bill VanDegrift
|
|
|
gw ok
|