Final | 9/29/2004 | 9/29/2004 | 9/29/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/29/2004 at 9:19:36 AM. Contact: ###-####.
|
Plumbing Rough-in | 9/2/2004 | 9/3/2004 | 9/3/2004 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/2/2004 at 4:39:29 PM. Contact: ###-####. air test on water system failed dwv system test ok called contractor will recall when ready 9/3/2004 9:09:03 AM
|
Plumbing Rough-in | 9/3/2004 | 9/3/2004 | 9/3/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 9:11:09 AM. Contact: ###-####.
|