Final | 1/14/2005 | 1/14/2005 | 1/14/2005 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 9:17:17 AM. Contact: ###-####.
|
Final | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 8:42:08 AM. Contact: ###-####. upc 2003 414.1 need to provide 120 degree hot water limitation to public lav;s upc 2003 408.2 joints need to seal mpo sink at wall need to have occupation card on job site for final sign off 1/12/2005 2:33:24 PM
|
Plumbing Rough-in | 11/2/2004 | 11/3/2004 | 11/3/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/2/2004 at 2:04:46 PM. Contact: ###-####.
|
Groundwork | 9/13/2004 | 9/13/2004 | 9/13/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 7:08:15 AM. Contact: ###-####.
|
Groundwork | 9/10/2004 | 9/10/2004 | 9/10/2004 | P | FAIL |
Jim Johnson
|
|
|
Underground inspection please/// Mary ###-#### no test on DWV groundwork called contractor will recall when ready 9/10/2004 1:24:18 PM
|