Final | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 9:28:36 AM. Contact: ###-####. lacy did roughin and debest is setting the fixtures with the TI on a seperate permit. 2/8/2005 2:11:06 PM
|
Plumbing Rough-in | 12/10/2004 | 12/13/2004 | 12/13/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/10/2004 at 3:56:44 PM. Contact: ###-####.
|
Roof Drains | 11/17/2004 | 11/17/2004 | 11/17/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/17/2004 at 8:08:17 AM. Contact: ###-####.
|
Groundwork | 10/12/2004 | 10/13/2004 | 10/13/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/12/2004 at 12:06:45 PM. Contact: ###-####.
|