Final | 5/24/2005 | 5/24/2005 | 5/24/2005 | P | PASS |
Bill VanDegrift
|
|
|
call 1/2 1st before insp - mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok
|
Plumbing Rough-in | 2/11/2005 | 2/11/2005 | 2/11/2005 | P | PASS |
Bill VanDegrift
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles add nail plates and the ri is ok 2/11/2005 3:02:13 PM
|
Other | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Bill VanDegrift
|
|
|
mark ###-#### conference, valve all fixtures went over water heater sizing, pipe sizing, existing venting, may need to seperate water systems if it goes to a duplex, verify with building code. 10/8/2004 1:42:28 PM
|