Final | 12/2/2004 | 12/3/2004 | 12/3/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/2/2004 at 5:24:21 PM. Contact: ###-####.
|
Other | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Bill VanDegrift
|
|
|
Alan; Phone #: ###-#### please call fiirst, thanks. Internet Inspection Request from: Aimee Hughes provide r.p. ahead of filtered water/pump system, provide rp at espresso, additional cross connection protection may be required at coffee brewer, provide mixing valves at hand sinks. 12/2/2004 2:23:01 PM
|
Plumbing Rough-in | 11/8/2004 | 11/9/2004 | 11/9/2004 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/8/2004 at 6:46:59 PM. Contact: ###-####.
|
Groundwork | 10/13/2004 | 10/14/2004 | 10/14/2004 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/13/2004 at 4:10:48 PM. Contact: ###-####. gw ok 10/14/2004 9:01:10 AM
|