Final | 12/14/2004 | 12/15/2004 | 12/15/2004 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/14/2004 at 1:39:33 PM. Contact: ###-####. FINAL OK 12/15/2004 8:59:29 AM
|
Plumbing Rough-in | 10/26/2004 | 10/27/2004 | 10/27/2004 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/26/2004 at 2:40:57 PM. Contact: ###-####. ri ok 10/27/2004 9:53:14 AM
|
Plumbing Rough-in | 10/25/2004 | 10/25/2004 | 10/25/2004 | P | FAIL |
Bill VanDegrift
|
|
|
Platinum Plumbing; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner water line to water heater/ cold water to 2nd floor is undersized, complete nail plating 10/25/2004 2:03:58 PM
|