DOC - Permit Finaled | | | 6/7/2005 | | DONE |
|
|
|
|
Water and/or Sewer | 5/17/2005 | 5/18/2005 | 5/18/2005 | A | PASS |
Jim Johnson
|
|
|
Final for this was never scheduled - project complete and ready for final.; Phone #: ###-#### Internet Inspection Request from: James Romano
|
Water and/or Sewer | 11/4/2004 | 11/4/2004 | 11/4/2004 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/4/2004 at 6:30:41 AM. Contact: ###-####. new water line ok ok to cover need to provide blow out tee and union on downstream side of pvb contractor to call when ready 11/4/2004 10:15:15 AM
|
Water and/or Sewer | 11/1/2004 | 11/2/2004 | 11/2/2004 | A | PART |
Jim Johnson
|
|
|
jim ###-#### visual on new water line ok to cover water line but needs to leave connection by meter and sprinkler connection exposed will test new line when meter has been installed 11/2/2004 8:46:17 AM
|