Final | 6/30/2005 | 7/1/2005 | 7/1/2005 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 4:39:38 PM. Contact: ###-####.
|
Storm Drains | 5/3/2005 | 5/4/2005 | 5/4/2005 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/3/2005 at 5:11:33 PM. Contact: ###-####. strom drains test ok ok to cover
|
Plumbing Rough-in | 4/14/2005 | 4/14/2005 | 4/14/2005 | A | PASS |
Jim Johnson
|
|
|
Venting has been changed as requested. Thank You ; Phone #: ###-#### Internet Inspection Request from: Brent Lacy
|
Plumbing Rough-in | 3/25/2005 | 3/25/2005 | 3/25/2005 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/25/2005 at 7:48:50 AM. Contact: ###-####. need to repipe vent,s to equal cross sectional area of building drain contractor to recall when ready 3/25/2005 3:36:12 PM
|
Groundwork | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 7:54:37 AM. Contact: ###-####.
|
Water and/or Sewer | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 7:53:31 AM. Contact: ###-####.
|