Final | 1/27/2005 | 1/27/2005 | 1/27/2005 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 6:50:43 AM. Contact: ###-####.
|
Plumbing Rough-in | 1/10/2005 | 1/10/2005 | 1/10/2005 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/10/2005 at 10:00:51 AM. Contact: ###-####.
|
Plumbing Rough-in | 12/9/2004 | 12/9/2004 | 12/9/2004 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/9/2004 at 7:19:11 AM. Contact: ###-####. above floor rough-in only ok 12/9/2004 10:06:17 AM
|