Final | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/19/2005 at 8:40:02 AM. Contact: ###-####. final ok
|
DOC - Permit Finaled | | | 4/19/2005 | | PASS |
|
|
|
|
Final | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 2:59:21 PM. Contact: ###-####. temp occ ok needs avb on three other hair wash sinks. 4/8/2005 1:22:19 PM
|
Final | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 7:20:08 AM. Contact: ###-####. test dcva, thermol expantion protection required, avb is required to be above flood level of fixture. 4/7/2005 1:44:26 PM
|
PLM-Aging Inspection | 4/5/2005 | 4/5/2005 | 4/5/2005 | | PASS |
Bill VanDegrift
|
|
|
no calls for inspection 4/5/2005 8:12:18 AM
|
Plumbing Rough-in | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PASS |
Ron Ginner
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Water and/or Sewer | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | PART |
Bill VanDegrift
|
|
|
henry--###-#### new water service and partial sewer 1/24/2005 1:23:20 PM
|
Groundwork | 12/21/2004 | 12/21/2004 | 12/21/2004 | P | PASS |
Bill VanDegrift
|
|
|
gw ok
|
Plumbing Rough-in | 12/21/2004 | 12/21/2004 | 12/21/2004 | P | NR |
Bill VanDegrift
|
|
|
dale-- ###-####
|