Final | 3/25/2005 | 3/28/2005 | 3/28/2005 | A | PASS |
Jim Johnson
|
|
|
contact is Jim Cooper ###-####, double check valves have been installed as requested.; Phone #: ###-#### Internet Inspection Request from: Christine Cooper
|
Water and/or Sewer | 3/25/2005 | 3/28/2005 | 3/25/2005 | A | CANC |
Jim Johnson
|
|
|
Contact is Jim Cooper ###-####; Phone #: ###-#### Internet Inspection Request from: Christine Cooper Inspection cancelled from web by: Christine Cooper
|
Final | 3/18/2005 | 3/18/2005 | 3/18/2005 | P | PART |
Jim Johnson
|
|
|
side door to garage will be open Internet Inspection Request from: Christine Cooper need to have double check backflow preventer installed on hot and cold water supply lines to pedicure spa and have tested and certified for final inspection 3/18/2005 2:10:55 PM
|
Plumbing Rough-in | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | PASS |
Ron Ginner
|
|
|
###-#### jim
|