Final | 8/29/2005 | 8/29/2005 | 8/29/2005 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 8/29/2005 at 9:23:20 AM. Contact: ###-####.
|
Plumbing Rough-in | 4/20/2005 | 4/20/2005 | 4/20/2005 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 9:14:10 AM. Contact: ###-####.
|
Groundwork | 2/3/2005 | 2/3/2005 | 2/3/2005 | P | PASS |
Gary Ziegler
|
|
|
jd simpson-- ###-####
|