Final | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 12:45:32 PM.
|
Final | 3/29/2005 | 3/29/2005 | 3/29/2005 | P | PASS |
Bill VanDegrift
|
|
|
final ok 3/29/2005 9:55:02 AM
|
Plumbing Rough-in | 2/11/2005 | 2/14/2005 | 2/14/2005 | A | PASS |
Bill VanDegrift
|
|
|
ri ok 2/14/2005 11:11:24 AM
|
Plumbing Rough-in | 2/11/2005 | 2/11/2005 | 2/11/2005 | P | FAIL |
Bill VanDegrift
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Jan Rice needs air gap for water softenor flush line, complete nail plating 2/11/2005 2:10:12 PM
|