DOC - Permit Finaled | | | 4/25/2005 | | PASS |
|
|
|
|
Final | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht final ok
|
Final | 4/18/2005 | 4/18/2005 | 4/18/2005 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht air gap ice bin drain, set soda equipment, test back flow preventors, temp occ ok
|
Final | 4/15/2005 | 4/15/2005 | 4/15/2005 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht air gap required on sink wastes and ice bin drain, calk all fixtures, set soda dispensor, test all backflow preventors, provide water to soap dispensor at mop sink, include shutoff valve and pvb, dcva required at ice tea brewer/coffee maker, pvb required at steam unit by fryer, thermol expantion protection required. 4/15/2005 4:45:57 PM
|
Plumbing Rough-in | 3/14/2005 | 3/15/2005 | 3/15/2005 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht ri ok 3/15/2005 9:53:50 AM
|
Roof Drains | 3/11/2005 | 3/11/2005 | 3/11/2005 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht changed to 2 sets of drains test ok 3/11/2005 1:17:07 PM
|
Plumbing Rough-in | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | PART |
Bill VanDegrift
|
|
|
Partial rough; Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht restrooms ri ok 3/10/2005 3:41:42 PM
|
Plumbing Rough-in | 2/23/2005 | 2/23/2005 | 2/23/2005 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht grease waste gw ok 2/23/2005 11:36:52 AM
|