Final | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | PASS |
Bill VanDegrift
|
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok
|
Final | 8/31/2005 | 9/1/2005 | 9/1/2005 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 5:02:18 PM. Contact: ###-####. hang waste piping in the crawlspace, pipe t&p and pan drain outside.
|
Final | 8/15/2005 | 8/16/2005 | 8/15/2005 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/15/2005 at 11:32:13 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 15 2005 3:45PM.
|
Plumbing Rough-in | 5/10/2005 | 5/10/2005 | 5/11/2005 | P | PART |
Bill VanDegrift
|
|
|
top ri ok
|
Plumbing Rough-in | 5/5/2005 | 5/5/2005 | 5/6/2005 | P | FAIL |
Bill VanDegrift
|
|
|
PAUL CELL ###-#### call 1st for access provide 2" waste to the k.s. and washer box. provide 3/4" to water heater from existing main shutoff valve, 3/4" hot water to split up system. use drainage fittings at tub waste connections. provide informat
|