Final | 9/29/2005 | 9/29/2005 | 9/29/2005 | P | PASS |
Daryl Spivey
|
|
|
Internet Inspection Request from: Brent Lacy Will replace toilet tank as soon as the right one arrives. ds
|
Final | 9/28/2005 | 9/29/2005 | 9/29/2005 | A | CANC |
Daryl Spivey
|
|
|
ready at 3:00 P.M. 9/28/05 at Lucys vanilla finish (includes toilet, lav, and water heater) Thank You! Internet Inspection Request from: Brent Lacy
|
PLM-Aging Inspection | 8/15/2005 | 8/15/2005 | 8/15/2005 | | PASS |
Bill VanDegrift
|
|
|
|
Plumbing Rough-in | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/14/2005 at 11:18:13 AM. Contact: ###-####. ri ok
|
Plumbing Rough-in | 5/31/2005 | 6/1/2005 | 6/1/2005 | A | NR |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 4:10:20 PM. Contact: ###-####.
|
Water and/or Sewer | 6/1/2005 | 6/1/2005 | 6/1/2005 | A | NR |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 4:10:20 PM. Contact: ###-####.
|
Groundwork | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Bill VanDegrift
|
|
|
robert ###-#### gw ok
|