Final | 12/7/2005 | 12/7/2005 | 12/8/2005 | P | PASS |
Gary Ziegler
|
|
|
PLEASE CALL GRANT - HE WANTS THIS TO BE THE LAST INSPECTION THIS AFTERNOON. THANK YOU. ; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 8/3/2005 | 8/4/2005 | 8/4/2005 | A | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 8/3/2005 at 12:47:51 PM. Contact: ###-####.
|
Plumbing Rough-in | 7/13/2005 | 7/13/2005 | 7/13/2005 | A | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 7/13/2005 at 7:27:53 AM. Contact: ###-####. water line put in for pot filler.
|
Plumbing Rough-in | 6/28/2005 | 6/29/2005 | 6/30/2005 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 10:37:10 AM. Contact: ###-####.
|
Plumbing Rough-in | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PASS |
Gary Ziegler
|
|
|
Please call Blair and schedule to meet him at Condo #1607 at or after 1:00 p.m. today to review.; Phone #: ###-####
|