Final | 2/15/2006 | 2/15/2006 | 2/15/2006 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/15/2006 at 7:51:04 AM. Contact: ###-####.
|
Plumbing Rough-in | 2/15/2006 | 2/15/2006 | 2/15/2006 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/15/2006 at 7:51:04 AM. Contact: ###-####.
|
Final | 2/13/2006 | 2/14/2006 | 2/14/2006 | A | FAIL |
Daryl Spivey
|
|
|
R/I not passed and needs airgap on softner drain. ds
|
Final | 2/13/2006 | 2/13/2006 | 2/13/2006 | P | CANC |
Daryl Spivey
|
|
|
need to call for access///jan or cell# ###-####; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Plumbing Rough-in | 7/11/2005 | 7/11/2005 | 7/11/2005 | P | FAIL |
Bill VanDegrift
|
|
|
1:30 needs water softenor drain and a drop ear ell at the hose bib by the master tub.
|
Plumbing Rough-in | 7/8/2005 | 7/11/2005 | 7/11/2005 | A | NH |
Bill VanDegrift
|
|
|
ina; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|