Final | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/14/2005 at 12:55:10 PM. Contact: ###-####.
|
Plumbing Rough-in | 7/20/2005 | 7/20/2005 | 7/20/2005 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/20/2005 at 7:39:37 AM. Contact: ###-####.
|
Plumbing Rough-in | 7/12/2005 | 7/12/2005 | 7/12/2005 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/12/2005 at 7:22:51 AM. Contact: ###-####. move waters to front of 2x6 wall on north east corner need to move tub trap in cantilever area to inside warm side of wall contractor to recall when ready
|