Final | 9/26/2005 | 9/26/2005 | 9/26/2005 | P | PASS |
Jim Johnson
|
|
|
jason --; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Final | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | PART |
Jim Johnson
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need to anchor softner drain 1 inch above floor level rim of washer box contractor to recall when ready
|
Plumbing Rough-in | 7/26/2005 | 7/26/2005 | 7/26/2005 | P | PASS |
Jim Johnson
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Plumbing Rough-in | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | FAIL |
Jim Johnson
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore test failed on DWV SYSTEM need to retest also need to provide cleanout in vertical portion of foot vent for island fixture called contractor will recall when ready
|
Plumbing Rough-in | 7/21/2005 | 7/22/2005 | 7/22/2005 | P | CANC |
Jim Johnson
|
|
|
###-####- james
|